
Fast-Track Factory Move: 60-Ton Hydraulic Press Installation
Project Overview: Relocating a heavy automotive manufacturing line from an old facility to a new high-tech plant within 48 hours to prevent production downtime.
The Challenge:
Extremely low ceiling clearances and a finished epoxy floor that could not be damaged by heavy equipment.
Engineering Solution:
- Equipment: A compact Terex AC 40 City crane and a system of heavy-duty hydraulic skates.
- Strategy: A tandem lift was executed to bring the press from a horizontal transport position to a vertical working position inside the hall.
Technical Specs:
- Load Weight: 62 Tons.
- Ceiling Clearance: Only 1.5 meters above the crane boom.
- Floor Protection: Specialized rubber-coated load distributors to protect the factory floor.